ABM were commissioned to Design and Install a new BBT Tank Farm to supply a new Keg Racking Line which was installed at Diageo Packaging facility in Runcorn as part of their plans to close the Park Royal Brewery in London.
This work involved the Design of the new Tank Farm which was to utilise 8 off BBT's from the Park Royal Site.
The control of the new plant was to be integrated into the new Software Control System recently commissioned by ABM.
This work involved the Design of the new Tank Farm which was to utilise 8 off BBT's from the Park Royal Site.
The control of the new plant was to be integrated into the new Software Control System recently commissioned by ABM.
This plant was brought on stream 4 weeks ahead of schedule whilst meeting all of the necessary Process and CIP Requirements as detailed by Diageo at the onset of the project.