Diageo Runcorn - Complete Control System Upgrade

Posted on 17 December 2004 by Paul_E

ABM completed a Full Control System upgrade from an obsolete Stonefield Microprocessor and Hard Wired Mimic based system to a new Siemens S7/In-Touch Scada/Management Information System.

This upgrade involved the following

  • New Panel Design and Installation
  • New Solenoids throughout
  • Changeover of approx 3000 I/O
  • Full Operator Training prior to changeover
  • Full I/O Checking on completion
  • Plant Commissioning
  • Management Information System Commissioning

This system changeover was carried out over the Christmas/New Year plant shut down, with no loss of production.