Diageo Runcorn - CIP Unit Installation

Posted on 24 October 2004 by Paul_E

ABM has completed the installation of a new updated CIP Plant to clean all of the existing, new plant at the Diageo Packaging Facility in Runcorn.

This 4 Tank, 6 Circuit Unit replaces 2 off existing units which, after a detailed ABM Site Survey, were shown to be too small to clean the revised plant requirements.

This new Unit involved

  • The Design and Sizing of the New Unit
  • The Installation of 4 off Reconditioned Tanks
  • The Installation of new Automatic Routing Valves throughout
  • The installation of all new CIP Supply/Return Mains
  • The Development of the new PLC/Scada Software to control the plant
  • Full Operator Training prior to changeover
  • Full Plant Commissioning

This was carried out as a Full Turnkey Project

Other Articles

Recommended

Harlow Chemicals Installs State-Of-The-Art Automation with ABM Limited

Process automation specialist, ABM Limited were faced with a major challenge when asked to bring it's specialist experience to the…

ABM Aquire CSS

View All
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram